Asahi Shinbun - Tepco Subcontractor Ordered Cleanup Workers To Cover Dosimeters W. Lead Plates
Workers at the crippled Fukushima No. 1 nuclear plant were ordered to cover their dosimeters with lead plates to keep radiation doses low enough to continue working under dangerous conditions, the Asahi Shimbun has learned.
Some refused the orders. Others raised questions about their safety and the legality of the practice. But the man in charge, a senior official of a subcontractor of Tokyo Electric Power Co., warned them that they would lose their jobs--and any chance of employment at other nuclear plants--if they failed to comply.
The pocket-sized dosimeters sound an alarm when they detect high radiation levels. A worker who has been exposed to an accumulated dose of 50 millisieverts within a year must stop working and stay away from the area for a certain period of time.
The 54-year-old senior official at Build-Up, a midsize construction company based in Fukushima Prefecture, worked out a system to ensure the dosimeters would not reach the limit, according to the workers. It included having the workers themselves build the lead cover that would prevent the radiation from reaching the dosimeters.
EDIT
http://ajw.asahi.com/article/0311disaster/fukushima/AJ201207210069