amborin Donating Member (1000+ posts) Send PM | Profile | Ignore Tue May-11-10 08:54 PM
Original message
Is BP's Atlantis Project the Next Looming Disaster?
Share2073 Whistleblower: BP Risks More Massive Catastrophes in Gulf


......documents related to its Atlantis project, discovered that the drilling platform had been operating without a majority of the engineer-approved documents it needed to run safely, leaving the platform vulnerable to a catastrophic disaster that would far surpass the massive oil spill that began last week following a deadly explosion on a BP-operated drilling rig.
BP's own internal communications show that company officials were made aware of the issue and feared that the document shortfalls related to Atlantis "could lead to catastrophic operator error" and must be addressed.
Indeed, according to an August 15, 2008, email sent to BP officials by Barry Duff, a member of BP's Deepwater Gulf of Mexico Atlantis Subsea Team, the Piping and Instrument Diagrams (P&IDs) for the Atlantis subsea components "are not complete" and "there are hundreds if not thousands of subsea documents that have never been finalized, yet the facilities have been" up and running. .........BP did not respond to repeated requests for comment for this story. Despite the claims that BP did not maintain proper documentation related to Atlantis, federal regulators authorized an expansion of the drilling project.
Last May, Mike Sawyer, a Texas-based engineer who works for Apex Safety Consultants, voluntarily agreed to evaluate BP's Atlantis subsea document database and the whistleblower's allegations regarding BP's engineering document shortfall related to Atlantis. Sawyer concluded that of the 2,108 P&IDs BP maintained that dealt specifically with the subsea components of its Atlantis production project, 85 percent did not receive engineer approval.
Even worse, 95 percent of Atlantis' subsea welding records did not receive final approval, calling into question the integrity of thousands of crucial welds on subsea components that, if they were to rupture, could result in an oil spill 30 times worse than the one that occurred after the explosion on Deepwater Horizon last week.

snip

".......BP's "widespread pattern of unapproved design, testing and inspection documentation on the Atlantis subsea project creates a risk of a catastrophic incident threatening the deep-water environment and the safety of platform workers." Moreover, "the extent of documentation discrepancies creates a substantial risk that a catastrophic event could occur at any time."

"The absence of a complete set of final, up-to-date, 'as built' engineering documents, including appropriate engineering approval, introduces substantial risk of large scale damage to the deep water environment and harm to workers, primarily because analyses and inspections based on unverified design documents cannot accurately assess risk or suitability for service," Sawyer's report said. He added, "there is no valid engineering justification for these violations and short cuts."
Sawyer explained that the documents in question - welding records, inspections and safety shutdown logic materials - are "extremely critical to the safe operation of the platform and its subsea components." He said the safety shutdown logic drawings on Atlantis, a complex computerized system that, during emergencies, is supposed to send a signal to automatically shut down the flow of oil, were listed as "requiring update."
"BP's recklessness in regards to the Atlantis project is a clear example of how the company has a pattern of failing to comply with minimum industry standards for worker and environmental safety," Sawyer said.

..................The oil spill blanketing roughly 4,000 square miles in the Gulf of Mexico after the Deepwater Horizon explosion, which killed eleven workers, was exacerbated, preliminary reports suggest, by the failure of a blowout preventer to shut off the flow of oil on the drilling rig and the lack of a backup safety measure, known as a remote control acoustic shut off switch, to operate the blowout preventer.
Congressman Henry Waxman, chairman of the Committee on Energy and Commerce, sent a letter Thursday to BP Chairman and President Lamar McKay seeking documents related to inspections on Deepwater Horizon conducted this year and BP's policy on using acoustic shut off switches in the Gulf of Mexico.


Profits Before Safety
Whether it's the multiple oil spills that emanated from BP's Prudhoe Bay operations in Alaska's North Slope or the March 2005 explosion at the company's Texas refinery that killed 15 employees and injured 170 people, BP has consistently put profits ahead of safety.
On October 25, 2007, BP pled guilty to a criminal violation of the Clean Water Act and paid a $20 million fine related to two separate oil spills that occurred in the North Slope in March and August of 2006, the result of a severely corroded pipeline and a safety valve failure. BP formally entered a guilty plea in federal court on November 29, 2007. US District Court Judge Ralph Beistline sentenced BP to three years probation and said oil spills were a "serious crime" that could have been prevented if BP had spent more time and funds investing in pipeline upgrades and a "little less emphasis on profit."
Also on October 25, 2007, BP paid a $50 million fine and pleaded guilty to a felony in the refinery explosion. An investigation into the incident concluded that a warning system was not working and that BP sidestepped its own internal regulations for operating the tower. Moreover, BP has a prior felony conviction for improperly disposing of hazardous waste.


snip

http://www.truthout.org/whistlelower-bps-other-offshore-drilling-project-gulf-vulnerable-catastrophe59027
Printer Friendly | Permalink |  | Top
Greyskye Donating Member (1000+ posts) Send PM | Profile | Ignore Tue May-11-10 09:11 PM
Response to Original message
1. Shut it down pending review.

Hell, it sounds as if everything BP is doing could stand some serious scrutiny.
Printer Friendly | Permalink |  | Top
 
protocol rv Donating Member (1000+ posts) Send PM | Profile | Ignore Tue May-11-10 09:13 PM
Response to Reply #1
2. I doubt it
I'm sure the corporate plane used by their CEO is very safe :+
Printer Friendly | Permalink |  | Top
 
DU AdBot (1000+ posts) Click to send private message to this author Click to view 
this author's profile Click to add 
this author to your buddy list Click to add 
this author to your Ignore list Sat May 04th 2024, 05:32 AM
Response to Original message
Advertisements [?]
 Top

Home » Discuss » Archives » General Discussion (1/22-2007 thru 12/14/2010) Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC