Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

OK, so no nuclear in Italy. What else have they been doing?

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
This topic is archived.
Home » Discuss » Topic Forums » Environment/Energy Donate to DU
 
kristopher Donating Member (1000+ posts) Send PM | Profile | Ignore Fri Jul-22-11 03:55 AM
Original message
OK, so no nuclear in Italy. What else have they been doing?
Edited on Fri Jul-22-11 03:56 AM by kristopher
Very interesting detail on a range of policy moves to manage solar development in a responsible way.

Beyond Capacity: Why Italy Changed Its PV Strategy
By Yoav Banin, Solergy
July 20, 2011

Reducing costs is essential to achieving broad acceptance of solar energy and lessening dependence on fossil fuels. However, the latest episode in Italy's PV incentives drama has proven that grid parity alone is not enough to drive widespread adoption.

In addition to cost, both urban and rural Italians are carefully considering how to integrate PV into their environments in a way that is compatible with their daily lives and broader energy sourcing goals. In the short-term, they are prepared to pay higher incentives and accelerate permitting for certain PV configurations that reflect these goals, such as building integrated (BIPV), rooftop, and CPV.

The previous version of Conto Energia succeeded in driving record PV adoption but at an unforeseen price. The runaway success of Italy’s 3rd Conto Energia resulted in a boom of PV installations that far exceeded anyone’s expectations. Today, Italy has a total installed capacity more than 7.2 GW, enough to be considered a world leader alongside Germany. The nation also boasts some of the largest PV plants in the world.

However, the expected cost of the program raised alarms in the government and led to the suspension of the 3rd Conto Energia law only five months after it was enacted, far short of its intended three-year duration. Further concerns over land use, aesthetics, a loss of critical agricultural lands, and insufficient local content and job creation have led to a ‘pushback’ from regional governments, industry groups and consumers.

Even before the government got involved...

http://www.renewableenergyworld.com/rea/news/article/2011/07/beyond-capacity-why-italy-changed-its-pv-strategy?cmpid=SolarNL-Thursday-July21-2011
Printer Friendly | Permalink |  | Top

Home » Discuss » Topic Forums » Environment/Energy Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC