HomeLatest ThreadsGreatest ThreadsForums & GroupsMy SubscriptionsMy Posts
DU Home » Latest Threads » Forums & Groups » Topics » Foreign Affairs & National Security » Veterans (Group) » Army Plays Shell Game Wit...

Sat Apr 27, 2013, 08:46 AM

Army Plays Shell Game With Unfinished Apache Helicopters: Put The Transmission In, And Pull It Out A

http://defense.aol.com/2013/04/26/army-plays-shell-game-with-unfinished-apache-helicopters-put-th/



Army Plays Shell Game With Unfinished Apache Helicopters: Put The Transmission In, And Pull It Out Again
By Sydney J. Freedberg Jr.
Published: April 26, 2013

WASHINGTON: The Army's problem with its new Apache helicopters isn't as bad as we thought when we first wrote about it last week. It's worse.

We knew that Northstar Aerospace, the subcontractor making the transmissions for lead contractor Boeing, had fallen behind on building that crucial component. We knew at least seven of the latest model, the vaunted AH-64E Apache Guardian, had been built at some point without transmissions, rendering them unflyable until the part was finally installed.

What we didn't know was that the Army was taking new Apaches that did have transmissions, running them through the full battery of flight tests, formally accepting them from the contractor, and then taking the transmissions back out again. Why? So Boeing can re-install those transmissions on the next aircraft coming off the line, which allows that chopper to be tested, accepted, and stripped of its transmission in turn.

In brief, it looks like the service is playing a classic shell game that allows the aircraft to pass their flight tests even though there are not enough transmissions for all of them to actually fly at the same time. The Army insists Boeing is paying for all the extra work, as the company should. But installing, removing, reinstalling, re-removing, and re-reinstalling a component can't help but put unnecessary wear and tear on it. (There's a reason that technicians call the process, with grim humor, "cannibalization". The ultimate result is that transmissions will wear out faster, which in turn means more expense down the road and a higher probability of the part failing in combat.

1 replies, 1904 views

Reply to this thread

Back to top Alert abuse

Always highlight: 10 newest replies | Replies posted after I mark a forum
Replies to this discussion thread
Arrow 1 replies Author Time Post
Reply Army Plays Shell Game With Unfinished Apache Helicopters: Put The Transmission In, And Pull It Out A (Original post)
unhappycamper Apr 2013 OP
BlueToTheBone Apr 2013 #1

Response to unhappycamper (Original post)

Sat Apr 27, 2013, 09:56 AM

1. Let's hope the next transmissions don't need to be tested

for real life flight time.

Reply to this post

Back to top Alert abuse Link here Permalink

Reply to this thread